Building Wrap

Eurotunnel Security Buildings

Eurotunnel Le Shuttle manages and operates the Channel Tunnel between Britain and France including the vehicle shuttle services, and earns revenue on other trains Freight and Eurostar.

The terminal buildings in both the UK and France are now over twenty years old and as such are starting to show their age. Identity were contracted to give many of the buildings a face lift using graphics.

As part of a program to give the passengers an enhanced experience when passing through both the UK & French terminals, Identity designed, produced and installed this fresh look in the security check area's which included building wrapping and one way graphics on the windows of the buildings.

Consultation

Michael Gietzen visited Eurotunnel and completed a site visit, examining the building and discussing a variety of different finishes and methods with the client. At this meeting Eurotunnel were able to look at samples and agree their chosen materials.

case study fact


80 Panels

With over 80 separate panels and pieces this was a challenge for our production team.

Dedicated Project Management

Over the following few days design visuals and a detailed specification were provided to Eurotunnel for discussion and approval. The project now had a dedicated project manager, overseeing the design, manufacture and installation.

Another Happy Customer

The installation itself took three days and was completed by a team of five. Eurotunnel is extremely happy with the result – what next?!

case study stat

Forward Planning

Everything was pre-fabricated by Identity to reduce time on-site

back to the top